Energy / GOKKAYA DAM
Client
:
MEM Energy Inc
Location
:
Adana -Turkiye
Role
:
Subcontractor
Details
:

This is a BOT project which is licensed by Ministry of Energy and Natural Resources having Hydropower purpose which is located on Goksu river in Adana province. The Dam is Roller Compacted Concrete Type which has a height of 69 m above foundation and a crest length of 115 m. The power tunnel whose diameter is 4 m and length of 3,231 m. The powerhouse is an half open air type concrete structure hosting two vertical axis Francis type turbines, and installed capacity of each unit is 14.73 MW. With 29.46 MW total installed capacity, 73.45 m gross head and 51 m3/s discharge the facility could produce 113.14 GWh total energy per year. Works on the Project started on 15.10.2007 and the project was commissioned on 14.09.2012. It has been under operation since then.