Aviation / Kirkuk & Taji Airports Project
Client
:
US Air Force / 853rd ELSG
Location
:
Kirkuk & Taji Air Bases, Iraq
Schedule
:
2008 - 2009
Role
:
Prime Contractor
Details
:

As prime contractor, Kuanta was responsible for the design, procurement, delivery, construction, installation, commissioning and turnover of:

  • CAT 1 Airfield Lighting System for 3 runways (over 7,300 meters) and 36 taxiways (over 15,000 meters),
  • CAT 1 Navigational Aids, including ILS/DME, CVOR/DME (Kirkuk), DVOR/DME (Taji),
  • Automatic Weather Observation Systems (AWOS),
  • Air Traffic Control Tower upgrade, including remote control units, AFTN and VHF/UHF Radio Transceivers (material delivery only),
  • All related utilities and infrastructure work, including powering systems (generators, panels, distribution, UPS),
  • Approach and departure procedures (designed by Kuanta),
  • Commissioning Flight Checks.
  • Notably, Kuanta executed this complex project without interrupting or disturbing operations at these active U.S./Iraqi air bases

 

Kuanta has successfully completed the construction and commissioning phases of this project and turned over all equipment to the client. Currently, Kuanta’s on-site teams are providing warranty and contractor logistics support. Both bases continue to be used actively by U.S. and Iraqi air forces.

 

Aviation (All projects)

ABOUT KUANTA | AFFILIATES | CAPABILITIES | SOCIAL RESPONSIBILITY | CAREERS | CONTACT
KUANTA Inc. Construction Company © 2011 | Privacy Policy
Web Tasarım